PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Building the Elev. 1,2,3 Door Frames Facing West  (800x600).jpg Installing shear wall panels at Elev. 1,2,3 (4th Floor) Facing South (800x600).jpg Installing the underground piping at Men's Room 133 Facing North (800x600).jpg Installing the underground piping at the Locker Room 133 Facing North (800x600).jpg Rebar mats at Stair -4 (4th Floor) Facing North  (800x600).jpg Underground plumbing between column lines 3-3.5 from C-E. Facing West (800x600).jpg
Previous pageNext page Rebar mats at Stair -4 (4th Floor) Facing North  (800x600)
Rebar mats at Stair -4 (4th Floor) Facing North (800x600)